From Concept to Construction: Understanding the Design Development and Approvals Process

October 22, 2025

Turning Your Dream Into a Buildable Reality

You’ve already defined your goals, budget, and style — and you know what you want your home to deliver both now and into the future. The next stage is where your dream becomes something tangible: a set of fully developed plans ready for construction.



At Jetsonian Constructions, we call this the design development and approvals stage. It’s the technical backbone of your project — and one of the most important steps to get right. Yet, it’s also the phase that clients find most confusing, especially when it comes to understanding permits and compliance. Let’s break it down.

1. What Happens During Design Development

Once your concept plan captures your vision, we begin refining it into a detailed, buildable design that meets every structural, energy, and compliance requirement.


This stage includes:

  • Engineering design – slab, footing and truss details, load paths, and structural calculations.
  • Energy assessments – ensuring your home achieves a minimum energy standards under the NCC.
  • Soil testing and site surveys – confirming the right foundation system for your block.
  • Drainage and service layouts – meeting council and authority standards.
  • Refinement of floor plans, elevations, and joinery – ensuring your final drawings are functional, beautiful, and cost-efficient.


By the end of this process, you’ll have a complete set of construction-ready documents — everything needed for council approval and your builder to prepare the building contract.

2. Planning Permit vs Building Permit: What’s the Difference?

It’s one of the most common questions we hear — and for good reason. While both are approvals, they come from different authorities and serve very different purposes.

 

Planning Permit

Issued by your local council, a planning permit determines what you’re allowed to build. It looks at your home in the context of your neighbourhood and zoning requirements.


You might need one if your land has overlays (heritage, bushfire, flood), if you’re subdividing, building multiple dwellings, or proposing non-standard setbacks.



Not every project requires a planning permit — your builder or building designer will confirm this early on.

 

Building Permit

A building permit is issued by a private or municipal building surveyor and ensures your design complies with the Building Code of Australia and all structural, safety, and energy regulations.


It’s your legal approval to start construction. No building work — including site preparation — can begin without it.

 

Simple rule:
Planning = what you can build
Building = how it must be built

 

A Note on Report and Consent Applications

There are some situations where your design may slightly vary from standard building regulations — for example, building closer to a boundary, exceeding height limits, or altering overlooking distances.


In these cases, a Report and Consent application must be submitted to your local council.


This process is technically part of the building permit stage, but it involves council assessment, which is why it can feel a bit like “planning.” Think of it as the exception that sits between the two — it’s still handled through your building surveyor but relies on council’s approval to proceed.

3. How Jetsonian Streamlines the Process

Our design-and-construct approach means we handle the coordination for you. Once your concept is finalised, we:

  • Engage and liaise with engineers, energy assessors, and surveyors
  • We can prepare and submit all planning or building applications
  • Manage communication with councils and authorities
  • Keep you updated at every stage so you’re never left guessing


This ensures consistency between design intent, compliance requirements, and cost control — and helps avoid delays between approvals and site start.

4. Bringing It All Together

Understanding the design development and approvals process helps you see just how much work happens before the build begins. Every report, drawing, and approval ensures your home is safe, compliant, efficient, and ready for construction.

 

At Jetsonian, we believe clarity builds confidence. By managing this process from concept to construction, we make sure your experience is smooth, transparent, and stress-free — because building your dream home should be exciting, not overwhelming.

Modern Single-Story House — Jetsonian Constructions In Wendouree, VIC
September 17, 2025
Discover how Jetsonian Constructions designs homes that reflect your lifestyle today and also adapt to your future needs for years to come. Contact our team today.
Modern two-story house with balcony and dark brick facade, with plants and sunset sky.
August 17, 2025
Choosing the right home style shapes more than street appeal. Jetsonian Constructions helps you design a home that fits today and adapts tomorrow. Contact us today.
Modern two-story house with white facade, black windows, and picket fence on a sunny day.
July 16, 2025
Setting a clear budget is the key to a smooth build. Jetsonian Constructions helps you plan realistically and avoid costly surprises. Contact our helpful team today.
A large modern house with a white roof and a brick wall — Jetsonian Constructions In Wendouree, VIC
June 4, 2025
Choosing the right building designer shapes the success of your project. At Jetsonian Constructions we guide you through every step. Contact us today to begin.